The Rigging Plan is a documented planning for the movement of loads considered risky, such as: Loads exceeding 90% of the crane’s load capacity; Hoisting with multiple cranes, exceeding 75% of their capacity; Hoisting where one or more cranes change position; Loads over operational or occupied installations, over process pipe racks, or near power lines;